Status Report for Week 3-2
03/21/13Tasks accomplished
- Identified nouns and discussed how the object model will look for the system.
All team members participated in both tasks. Everything was done during the team meeting.
Tasks In Progress
- Started work on the Design Document.
- We want to complete the design in the next week. This will give us about a week to pull together a prototype before the due date of April 3.
All team members participated in both tasks. Everything was done during the team meeting.
Tasks Planned For Next Week
- Continue hammering out the design details during the meetings.
- Divide up the work for diagramming all our design decisions to be put into the document.
- Have at least a working rough draft by Thursday, March 28 so all it needs is some polish before turning it in (e.g. formatting, proofing, etc).
Issues
- We need to figure out an easy way to conference call Sam into our meetings. Every time we fight with the camera and speaker and Google+ for about 30 minutes before he can connect and we can start our meeting for real.
Metrics
(Times below are since the last update unless otherwise noted.)- Effort expended on project for each person and the total for the team for that week and a running total.
- Christoffer Rosen: 1 Hour 30 Minutes in team meeting
- Emma Nelson: 1 Hour 30 Minutes in team meeting
- Sam Lucidi: 1 Hour 30 Minutes in team meeting
- Mustafa All-Sahihi: 1 Hour 30 Minutes in team meeting
- Ben Hare: 1 Hour 30 Minutes in team meeting
- Total: 42 Hours for all team members combined