Status Report for Week 3-2

03/21/13

Tasks accomplished

  1. Identified nouns and discussed how the object model will look for the system.
All team members participated in both tasks. Everything was done during the team meeting.

Tasks In Progress

  1. Started work on the Design Document.
    • We want to complete the design in the next week. This will give us about a week to pull together a prototype before the due date of April 3.
All team members participated in both tasks. Everything was done during the team meeting.

Tasks Planned For Next Week

  1. Continue hammering out the design details during the meetings.
  2. Divide up the work for diagramming all our design decisions to be put into the document.
  3. Have at least a working rough draft by Thursday, March 28 so all it needs is some polish before turning it in (e.g. formatting, proofing, etc).

Issues

  1. We need to figure out an easy way to conference call Sam into our meetings. Every time we fight with the camera and speaker and Google+ for about 30 minutes before he can connect and we can start our meeting for real.

Metrics

(Times below are since the last update unless otherwise noted.)
  1. Effort expended on project for each person and the total for the team for that week and a running total.
  2. Christoffer Rosen: 1 Hour 30 Minutes in team meeting
  3. Emma Nelson: 1 Hour 30 Minutes in team meeting
  4. Sam Lucidi: 1 Hour 30 Minutes in team meeting
  5. Mustafa All-Sahihi: 1 Hour 30 Minutes in team meeting
  6. Ben Hare: 1 Hour 30 Minutes in team meeting
  7. Total: 42 Hours for all team members combined